The trenches for the irrigation sleeves and storm drain pipes in front of the bike station were backfilled, and slurry cement was poured for the base of the curb, gutter, walkway, and curb ramp.
For the week of July 6, the contractor plans to work on the following:
• Demolish existing asphalt concrete.
• Pour concrete for the curb, gutter, and walkway in front of the bike station.
The working hours for this project are 7:30 am to 4:30 pm Monday through Friday. Emergency vehicles will always be provided with access.
Questions regarding this project may be directed to Matt Luttropp, Engineering Services Manager at 925-299-3247 or via email. Background on the project is available on our website.